# Our Proven Design & Permitting Process

## Our Proven Design & Permitting Process

At Streamline Design & Permitting, LLC, we guide homeowners, developers, and light commercial establishments through every step of the design and permitting process. Our five-phase approach simplifies regulations, clarifies design, and delivers construction-ready plans — from feasibility to final permit.

[Get Started](https://streamlinedesigngroup.com/contact-us)

- Streamline Design & Permitting
- /

- Process

Phase I

## Research & Development

Research and development planning

We’ll evaluate zoning regulations, setbacks, easements, historical overlays, and other factors that impact your property to create a clear foundation for compliant residential or commercial design.

- Site Discovery & Feasibility Analysis

Accurate interior, exterior, and lot measurements ensure your plans meet city and state permitting standards.

*Additional option:* We provide **site survey & topographic mapping** for complex or boundary-sensitive sites.

*Additional option:* **Soils & geotechnical reports** help analyze soil conditions critical for foundation and structural design, especially on sloped or complex sites.

- Site Measurements & Survey Coordination

An introductory meeting where we review your goals, discuss design vision, and outline the design and permitting workflow so you know what to expect.

- Kick-Off Call (KOC)

For projects in Coastal, HOA, or special overlay zones, early review helps prevent delays and confirms the project’s viability under local and state codes.

*Additional option:* **HOA & coastal coordination** services are available to manage complex approval processes.

This phase supports long-term success and can prevent costly revisions later in the **California permitting process.**

- Preliminary Agency Review (If Applicable)

Phase II

## Design & Development

Design development phase

Initial design concepts tailored to your preferences, lifestyle, and project goals.

- Design Review #1

A refined version of the preferred layout with updates to space planning and exterior appearance.

- Design Review #2

Final tweaks and minor adjustments before engineering coordination begins.

- Design Review #3

Once the design is approved, we prepare all documents for third-party engineers to ensure code compliance and structural integrity.

Our process includes up to three design revisions. Additional revisions may require a change order.

*Additional option:* Enhance your project with **high-quality rendering packages and virtual walkthroughs** to visualize the final design.

- Release for Engineering

Phase III

## Engineering & Submission Preparation

Engineering and consulting phase

We secure bids, oversee contracts, and manage communication with structural and MEP engineers.

*Additional option:* **Energy Code (T-24) Compliance** services ensure your project meets California’s energy standards.

*Additional option:* We can perform **electrical panel discovery** to evaluate existing electrical systems and inform engineering plans.

- Engineering Coordination

Your final building design and engineering plans are compiled into a permit-ready set.

- Submission Package Preparation

We review all materials with you before submitting to the local jurisdiction.

Engineering and third-party consultant fees are billed separately. We manage the entire coordination on your behalf.

- Release for Submission

Phase IV

## Permit Management

Permit management phase

We verify that all materials meet the city/county intake requirements.

- Submission & Intake Review

Separate departments (Zoning, Structural, Historical, etc.) will review your plans while we manage comments, revisions, and responses.

- Plan Review Coordination

Once all departments sign off, we submit final documents for approval and begin preparing for **permit issuance**.

We address all agency feedback and maintain active communication with reviewers to minimize delays in the permitting timeline.

- Completeness Review & Final Approval

Phase V

## Permit Issuance & Construction Support

Permit issuance, construction and inspections stages

We guide you through final fee payments and help you obtain your official building permit and approved plan set.

- Permit Issuance

We assist with clarifications or minor changes if field conditions require updates. We also coordinate with engineers if new calculations or drawings are needed.

- Construction & Inspections

After inspections and approvals, you’ll receive your certificate confirming that the structure is safe, compliant, and ready for use.

- Certificate of Occupancy

Contact Us

## Have Any Questions About Your Project?

Whether you're building a new ADU, remodeling your home, or making commercial tenant improvements, the Streamline Design & Permitting team is here to deliver quality design backed by expert permitting guidance. Contact us today to schedule a consultation or learn more about our pre-construction design and permitting services across California.

---

Streamline Design & Permitting — [https://streamlinedesigngroup.com/our-process](https://streamlinedesigngroup.com/our-process)